SAP Co Product Costing


SAP Co Product Costing
Define production scheduler:

SPRO à production àshop floor control à master data à define production scheduler

Select new entries button

Plant: AMLP

Production scheduler: C

Production scheduler name: Mr. C

Save (or) (ctrl + s)

Planning cost centre wise (KP06)

Version: 0

From period: 9 to 9

Fiscal year: 2006

Cost centre: Dept G

Next page

Cost centre: 400100 (Salaries)

Select form based radio button

Select over view screen button

Give plan fixed cost: 720000

Save
Planning for machine hours:

Accounting à controlling àcost centre accounting à planning à activity ad put/prices àchange (KP26)

Version: 0

From period: 9 to period: 9

Year: 2006

Cost centre: Dept G

Activity type: AML

Select form based radio button

Select overview screen button

Give plan activity 72000 (100 machines * 3 shifts * 30 days)

Save

Machine down rate calculation:

Accounting à controlling àcost centre accounting à planning à allocations àprice calculation (KSPI)

Select cost centre group radio button

Give the cost centre: AMLPRODN

Version: 0

From period: 9 to period: 9

Fiscal year: 2006

Execute

Select save button (or) (ctrl + s)

Ignore the message, press enter



Creation of material master: (MM01)

Give the material number: AMLRM2

Industry sector: Mechanical engineering

Material type: Raw material

Press: select use button

Select: Basic data, purchasing, general plant data/storage one, accounting

Select organization levels button

Give the plant: AML

Storage location: Hyd

Enter

Give the description: Raw material

Basic unit of measurement: Kg

Material group: Chem

Select purchasing tab

Purchasing group: AML

Select: Accounting1 tab

Valuation class: AML1

Price control: V

Moving price: 100

Save







Creation of finished goods master (MM01):

Material No: AMLFG1

Industrial sector: Mechanical engineering

Material type: Finished product

Press select views button

Select: Basic data1, MRP1, MRP2, work scheduling, general plant data/storage1, Accounting1, costing1.

Select organization levels button

Plant: AMLP

Storage location: Hyd

Enter

Give the description: Finished product1

Basic unit of measurement: Kg

Select: MRP1 tab

MRP type: select PD (MRP)

MRP controller: Select B (Mr. B)

Lot size: select Ex (Lotfor lot order quantity)

Select MRP2 Tab

In house production: 0 days

Schedule margin key: AML

Select work schedule time tab

Ignore the warning message, enter

Production: Scheduler C

Select accounting1 tab

Valuation class: AML2

Price control: S (Standard)

Give the standard price: 300/-

Select costing1 tab

Overhead group: Select AML

Availability check: Select KP (No check)

Save

Creation of Bill of material:

Logistics à production àmaster data àbills of material à bill of material à material BOM àCreate (CS01)

Give the material No: AMLFG1

Plant: AMLP

BOM usage: Select 1 (Production)

Enter

Give the component

For item 10: AMLRM1;         Qty: 1 Kg

Item 20: AMLRM2;               Qty: 1

Save

Creation of work centre:

Logistics à production àmaster data àwork centers àwork centre àcreate (CR01)

Work centre: Dept G

Work centre category: select 0001 (Machine)

Select basic data button

Give the description: Work centre Dept G

Person responsible: A

Usage, select 009 (All task lists types)

Standard value key: SAP1 (Normal production)

Select costing tab

Start date: 01.04.2006

Cost centre: Dept G

For activity machine: Give the activity type AML

Performance unit: H (Hour)

Formula key: SAP002 (Production machine types)

Save

Creation of routing:

Logistics à Production àmaster data àroutings àroutings àstandard routings à create (CA01)

Give the material No: AMLFG1

Plant: AMLP

Enter

Usage: select1 (Production)

Status: Select 4 (Release (General))

Select operation button

For operation at tab give the work centre: Dept G

Control key: Select PP01 (In house production)
Select operation: 10 and double click
Machine: standard values: 5
Unit: H (hours)
Save    
Creation of cost estimate with quality structure:

Accounting à controlling àproduct cost controlling à product cost planning à material costing àcost estimate with quantity structure à create (T. Code: CK11N)

Give the material: AMLFG

Plant: AMLP

Costing variant: PPC1 (Standard cost estimate)

Enter

Give the costing date from: 08.12.2006 Costing date to 31.12.9999

Qty structure date: 08.12.2006

Valuation date: 08.12.2006

Enter

Standard cost should be: 251.25

Cost sheet

RM – AMLRM1 – 75
       - AMLRM2 - 100
                             ------
                                              175.00
RM overhead 15%                  26.25
Production costs
(5*10) machine hours              50.00
                                               ---------
                                               251.25

From the menu select: Cost àDisplay cost components

Select save button (or) (ctrl + s)

Enter